• Project Name: Metro Line 1 S.A.S. 
  • Date (year): 2021-2024 
  • Client: Metro Line 1 S.A.S 
  • Location: Bogotá D.C 
  • Ownership: Metro Línea 1 S.A.S 

Project Summary 


The First Line of the Bogotá Metro (PLMB) is more than a transportation project; it is an opportunity to transform the public space along its route, improving the quality of life of both users of the system and citizens who live or work nearby. The figures are impressive: the project will renovate 1,348,106 m² of public space, including sidewalks, separators, plazas, bike paths and roads. In addition, Bogotá will gain 94,856 m² of new public space. 

The PLMB was designed under the principles of Development Oriented to Sustainable Transportation (DOTS), prioritizing modes of travel powered by the human body (walking, cycling or skateboarding) and those powered by clean energy (such as electric subways) over those powered by fossil fuels, which increase pollution. 

 

Talk to our experts

Geotechnical Instrumentation Services 


SOCOTEC Colombia has conducted laboratory tests focused on geotechnical characterization of the soils where the First Line of the Bogotá Metro is planned.  

These tests include analysis of mechanical, physical and chemical properties, with soil resistance, characterization and permeability tests. The results obtained are fundamental for the design of the foundations and the stability of the structures.  

In addition, the aforementioned conditions have been evaluated, thus ensuring the feasibility and safety of the project. Accurate soil characterization will allow for efficient and sustainable infrastructure planning. 

Socotec's experience 


SOCOTEC has an outstanding track record in performing geotechnical studies for metro projects internationally. Its previous experience in the Barcelona Metro has been fundamental to the success of that project, providing high quality services in quality control, testing and geotechnical studies. In Bogota, SOCOTEC applies this vast experience and technical expertise to ensure that the First Metro Line meets the highest standards of safety and efficiency. SOCOTEC's extensive experience in quality control and geotechnical testing guarantees a reliable and high quality execution of the project, contributing significantly to the sustainable urban development of the city. 

Do you want to know more about our projects? Contactez-nous

Contact us